GoMoos Sensor History for Sensor: AANCM969
- Manufacturer: Aanderaa_Instruments,
Model: 3429
Purchase Date: 2002-11-04
Deployed on Mooring: F0301
- Mooring Details: from 2017-05-19 15:00:00 to 2018-01-23 01:30:00
- Time Event: 2017-05-19 15:00:00, Deployed out of Castine for Seanet
Time Event: 2018-01-23 01:30:00, Recovered by R/V Connecticut. Mooring wire parted at termination during recovery; no subsurface IMs recovered. Anchor and chain also were not recovered.
- Data_type: current_u and Depth: 2 m
Table 'instruments.mooring_events' doesn't exist