GoMoos Sensor History for Sensor: AANVS266
- Manufacturer: Aanderaa_Instruments,
Model: 3544
Purchase Date: 2001-05-18
Deployed on Mooring: B0128
- Mooring Details: from 2016-07-08 13:15:00 to 2017-12-08 13:30:00
- Time Event: 2016-07-08 13:15:00, Redeployed by R/V Connecticut
Time Event: 2017-12-08 13:30:00, Recovered by R/V Connecticut. Heavily fouled with mussels; fishing gear entangled with wire. Gill sonic anemometer was damaged during recovery operations.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0126
- Mooring Details: from 2014-06-03 12:55:00 to 2015-06-04 16:15:00
- Time Event: 2014-06-03 12:55:00, Redeployed by R/V Connecticut.
Time Event: 2015-06-04 16:15:00, Recovered by R/V Connecticut. 1 solar panel broken off (possible storm damage); heavily fouled with mussels.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0124
- Mooring Details: from 2012-10-26 14:08:00 to 2013-06-20 11:46:00
- Time Event: 2012-10-26 14:08:00, Redeployed by R/V Connecticut
Time Event: 2013-06-20 11:46:00, Recovered by R/V Connecticut.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0123
- Mooring Details: from 2012-04-15 23:54:00 to 2012-10-26 13:20:00
- Time Event: 2012-04-15 23:54:00, Redeployed by R/V Delaware II
Time Event: 2012-10-26 13:20:00, Recovered by R/V Connecticut.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0118
- Mooring Details: from 2009-03-21 16:33:00 to 2009-09-23 21:20:00
- Time Event: 2009-03-21 16:33:00, Redeployed by R/V Delaware II.
Time Event: 2009-09-23 21:20:00, Recovered by R/V Argo Maine (lost anchor and most of chain due to heavy fouling with gear)/
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0116
- Mooring Details: from 2008-04-16 20:50:00 to 2008-10-02 11:15:00
- Time Event: 2008-04-16 14:50:00, Deployed from Delaware II
Time Event: 2008-10-02 11:15:00, Recovered by R/V Argo Maine.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0114
- Mooring Details: from 2007-03-24 01:15:00 to 2007-09-23 19:20:00
- Time Event: 2007-03-24 01:15:00, Mooring B0114 Redeployed By R/V Delaware II
Time Event: 2007-09-23 19:20:00, Recovered by R/V Argo Maine.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0111
- Mooring Details: from 2006-04-10 13:35:00 to 2006-09-13 11:30:00
- Time Event: 2006-04-10 13:40:00, redeployed by NOAA Ship Delaware II
Time Event: 2006-09-13 11:30:00, Recovered by R/V Argo Maine.
Time Event: 2006-09-13 14:34:00, Redeployed by R/V Argo Maine.
Time Event: 2006-09-13 11:30:00, Recovered by R/V Argo Maine
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0109
- Mooring Details: from 2005-04-29 03:30:00 to 2005-10-22 16:15:00
- Time Event: 2005-04-29 03:30:00, Redeployed by RV Delaware II
Time Event: 2005-07-31 12:00:00, Cellphone transmissions becoming intermittent.
Time Event: 2005-08-04 21:00:00, Last cellphone transmission was received. Cellular company reports that the buoy's cellphone is roaming and are looking into the problem.
Time Event: 2005-10-22 16:15:00, Recovered by R/V Argo Maine.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0106
- Mooring Details: from 2004-03-21 18:55:00 to 2004-10-07 18:05:00
- Time Event: 2004-03-21 18:50:00, Redeployed by R/V Argo Maine.
Time Event: 2004-10-02 18:00:00, Mooring recovered by R/V Argo Maine.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: E0104
- Mooring Details: from 2002-07-25 21:05:00 to 2002-12-18 16:45:00
- Time Event: 2002-07-25 21:05:00, Deployed by R/V Argo Maine.
Time Event: 2002-12-18 17:00:00, Mooring and all instrumentation were recovered.
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: E0103
- Mooring Details: from 2002-04-19 02:23:00 to 2002-07-25 13:55:00
- Time Event: 2002-04-19 03:00:00, Mooring at site E redeployed
Time Event: 2002-07-25 14:00:00, Recovered by R/V Argo Maine.
Time Event: 2003-01-17 00:00:00, Cell phone becoming intermittent in periods of cold/windy weather
- Data_type: visibility and Depth: -3 m
Deployed on Mooring: B0101
- Mooring Details: from 2001-07-09 22:05:00 to 2002-03-28 15:07:00
- Time Event: 2001-07-09 17:00:00, Deployed.
Time Event: 2002-03-28 14:45:00, Recovered by R/V Argo Maine.
- Data_type: visibility and Depth: -3 m
Non-Deployment Sensor Events:
- Time Event: 2016-04-03 00:00:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2014-04-24 00:00:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2012-03-15 00:00:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2009-02-18 00:00:00, Event: Calibration
- Comments: Calibrated prior to deployment
- Time Event: 2008-02-11 00:00:00, Event: Calibration
- Comments: Calibrated prior to deployment
- Time Event: 2007-01-23 00:00:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2006-03-22 00:00:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2003-08-21 00:00:00, Event: Prepared
- Comments: Ready for deployment