GoMoos Sensor History for Sensor: CAMAT015
- Manufacturer: Campbell,
Model: 107
Purchase Date: 2001-05-01
Deployed on Mooring: B0128
- Mooring Details: from 2016-07-08 13:15:00 to 2017-12-08 13:30:00
- Time Event: 2016-07-08 13:15:00, Redeployed by R/V Connecticut
Time Event: 2017-12-08 13:30:00, Recovered by R/V Connecticut. Heavily fouled with mussels; fishing gear entangled with wire. Gill sonic anemometer was damaged during recovery operations.
- Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: B0126
- Mooring Details: from 2014-06-03 12:55:00 to 2015-06-04 16:15:00
- Time Event: 2014-06-03 12:55:00, Redeployed by R/V Connecticut.
Time Event: 2015-06-04 16:15:00, Recovered by R/V Connecticut. 1 solar panel broken off (possible storm damage); heavily fouled with mussels.
- Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: B0121
- Mooring Details: from 2010-10-14 06:35:00 to 2011-10-07 19:10:00
- Time Event: 2010-10-14 06:35:00, Redeployed by R/V Connecticut
Time Event: 2011-10-07 19:10:00, Recovered by R/V Connecticut. Buoy and surface instruments were heavily fouled with marine growth but everything was eventually recovered intact.
- Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: J0214
- Mooring Details: from 2006-11-29 18:40:00 to 2007-12-06 18:35:00
- Time Event: 2006-11-29 18:40:00, deployed by commercial barge
Time Event: 2006-11-29 19:00:00, Cellphone data transfers are intermittent. Goes transfers also showing periods of missing transmissions.
Time Event: 2007-02-02 20:00:00, Buoy only calls in once per day due to drop in battery voltage below 11.5volts (solar panels iced over?).
Time Event: 2007-12-06 18:50:00, recovered by commercial barge
- Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: J0210
- Mooring Details: from 2005-05-20 12:30:00 to 2005-09-27 11:30:00
- Time Event: 2005-05-12 15:00:00, Redeployed by R/V Argo Maine.
Time Event: 2005-09-27 11:30:00, Recovered by R/V Argo Maine.
- Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: J0209
- Mooring Details: from 2004-10-03 20:30:00 to 2005-05-19 16:30:00
- Time Event: 2004-10-03 20:30:00, Mooring redeployed by R/V Argo Maine.
Time Event: 2005-05-19 16:30:00, Recovered by R/V Argo Maine.
- Data_type: air_temperature and Depth: -3 m
- Time:2005-01-24 12:00:00, Status: 0
- Comments: Wind speeds and directions appear to be working once again.
Deployed on Mooring: J0205
- Mooring Details: from 2003-09-24 23:24:00 to 2004-02-18 08:30:00
- Time Event: 2003-09-24 23:24:00, Redeployed by R/V Argo Maine
Time Event: 2004-01-07 00:00:00, Cell phone started having problems.
Time Event: 2004-02-18 09:00:00, Recovered by R/V Argo Maine
- Data_type: air_temperature and Depth: -3 m
Non-Deployment Sensor Events:
- Time Event: 2006-11-07 00:00:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2006-03-21 00:00:00, Event: Prepared
- Comments: Ready for deployment