GoMoos Sensor History for Sensor: GARGP2J5061634
- Manufacturer: ,
Model:
Purchase Date:
Deployed on Mooring: M0134
- Mooring Details: from 2025-07-30 00:16:00 to 2025-09-17 09:35:00
- Time Event: 2025-07-30 00:16:00, deployed by the M/V James K Goodwin
Time Event: 2025-09-14 19:00:00, buoy adrift, mooring wire cut at 200m by fishing vessel
Time Event: 2025-09-17 09:35:00, Recovered by M/V New Ledge (Determination Marine), buoy adrift
Time Event: 2025-09-17 09:35:00, Recovered by M/V New Ledge (Determination Marine), buoy adrift
- Data_type: gps_lat and Depth: -4 m
Data_type: gps_lon and Depth: -4 m
Deployed on Mooring: M0131
- Mooring Details: from 2021-06-12 03:21:00 to 2021-11-04 10:49:00
- Time Event: 2021-06-12 03:21:00, deployed by the R/V Connecticut
Time Event: 2021-11-04 11:49:00, recovered by M/V Warren
- Data_type: gps_lat and Depth: -4 m
Data_type: gps_lon and Depth: -4 m
Deployed on Mooring: M0130
- Mooring Details: from 2020-11-08 21:05:00 to 2021-04-09 14:00:00
- Time Event: 2020-11-08 20:50:00, Redeployed by R/V Connecticut
Time Event: 2020-11-08 20:51:00, unable to dial in to iridium modem. Modem will not answer. Can connect occasionally at end of callback session before hangup
Time Event: 2020-12-04 00:54:00, SUNAs and IMS begin missing data and becoring badly intermittent. Some noise and corruption.
Time Event: 2021-03-24 20:00:00, Buoy is no longer anchored, slowly moving with all subsurface instruments still reporting. Data flagged as off-station.
Time Event: 2021-04-09 14:00:00, Buoy intercepted by R/V Determination Marine. Subsurface instruments recovered from wire and buoy was towed back to SW Harbor
- Data_type: gps_lat and Depth: -4 m
Data_type: gps_lon and Depth: -4 m