GoMoos Sensor History for Sensor: RMYWM48492
- Manufacturer: RM_Young,
Model: 05106-5
Purchase Date: 2001-04-01
Deployed on Mooring: VI114
- Mooring Details: from 2024-09-09 15:46:00 to 0000-00-00 00:00:00
- Time Event: 2024-09-02 12:54:00, deployed by Lighthouse Marine
- Data_type: wind_gust and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: B0135
- Mooring Details: from 2021-06-16 11:50:00 to 2021-11-03 11:25:00
- Time Event: 2021-06-16 11:50:00, deployed by R/V Connecticut after instrument swap
Time Event: 2021-11-03 11:25:00, recovered by M/V Warren
- Data_type: wind_gust and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: B0134
- Mooring Details: from 2020-09-15 02:21:00 to 2021-06-16 10:45:00
- Time Event: 2020-09-15 02:21:00, deployed by the R/V Connecticut
Time Event: 2020-09-15 18:35:00, recovered by the R/V Connecticut
Time Event: 2021-06-16 11:00:00, recovered by R/V Connecticut prior to instrument swap
- Data_type: wind_speed and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: PR209
- Mooring Details: from 2018-05-08 14:40:00 to 2019-08-12 13:05:00
- Time Event: 2018-05-08 14:40:00, CARICOOS buoy 41053 (PR2 - San Juan) was redeployed at about 1440 GMT.
Time Event: 2019-08-12 13:05:00, recovered by Lighthouse Marine
- Data_type: wind_gust and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: F0129
- Mooring Details: from 2016-10-07 13:10:00 to 2018-01-24 13:09:00
- Time Event: 2016-10-07 13:10:00, Redeployed by R/V PISCES
Time Event: 2016-11-20 00:00:00, Last data received from both cell and goes - datalogger appears locked up?
Time Event: 2016-11-23 05:00:00, Data coms have resumed - both cell and goes reporting valid data once again.
Time Event: 2017-02-09 03:10:00, All communications stopped from this buoy (no cellphone, no Goes).
Time Event: 2017-02-09 09:00:00, Normal communications resumed from this buoy (both cell and Goes). Note: visibility voltage went to a constant 4.9 after reading 0 for past few months.
Time Event: 2017-03-04 01:00:00, Last cellphone transmission from this buoy. Goes transmissions continue to be valid.
Time Event: 2017-06-01 15:15:00, New phone was installed in control box and complete data transfer has resumed once again.
Time Event: 2017-06-23 14:30:00, All communications failed for this buoy (both cell and Goes); probably data logger lockup.
Time Event: 2017-06-24 19:50:00, Buoy is sending valid data once again after probable datalogger lockup.
Time Event: 2018-01-24 13:20:00, Recovered by R/V Connecticut.
- Data_type: wind_speed and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: F0128
- Mooring Details: from 2015-10-28 18:45:00 to 2016-10-06 12:31:00
- Time Event: 2015-10-28 18:45:00, Redeployed (turnaround) by R/V Connecticut
Time Event: 2016-07-12 07:10:00, Last cell phone connection from buoy; backup Goes data stream is still sending good data.
Time Event: 2016-07-14 00:00:00, Cellphone transmissions have resumed once again from this buoy.
Time Event: 2016-10-06 12:31:00, recovered by R/V Pisces
- Data_type: wind_gust and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: F0127
- Mooring Details: from 2014-12-05 17:50:00 to 2015-10-28 11:08:00
- Time Event: 2014-12-05 17:50:00, New control box swapped in by R/V C-Bold
Time Event: 2015-10-28 11:08:00, Recoverd by R/V Connecticut
- Data_type: wind_speed and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: F0126
- Mooring Details: from 2014-06-01 23:05:00 to 2014-12-05 18:02:00
- Time Event: 2014-06-01 23:05:00, Redeployed by R/V Connecticut.
Time Event: 2014-12-05 18:02:00, F0126's data logger/control box being replaced by R/V C-Bold.
- Data_type: wind_gust and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: F0124
- Mooring Details: from 2012-04-14 15:28:00 to 2013-06-22 16:10:00
- Time Event: 2012-04-14 15:28:00, Redeployed by R/V Delaware II.
Time Event: 2013-06-22 16:10:00, Recovered by R/V Connecticut.
- Data_type: wind_gust and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: E0119
- Mooring Details: from 2006-12-05 19:10:00 to 2007-05-09 17:15:00
- Time Event: 2006-12-05 19:10:00, deployed by the R/V Argo Maine
Time Event: 2007-05-09 15:15:00, Recovered by R/V Argo Maine (lost 50m sbe37im, chain, anchor).
- Data_type: wind_gust and Depth: -4 m
- Time:2006-12-31 22:00:00, Status: 1
- Comments: Gusts too high, flagged winds as invalid. Sonic anemometer working okay.
- Time:2007-02-10 12:00:00, Status: 0
- Comments: Winds appear okay once again from RMYoung wind sensor.
- Time:2007-01-15 12:00:00, Status: 0
- Comments: Valid wind speed and gust readings from RMYoung being received again.
- Time:2006-12-31 22:00:00, Status: 1
- Comments: Gusts too high, flagged winds as invalid. Sonic anemometer working okay.
- Time:2007-02-10 12:00:00, Status: 0
- Comments: Winds appear okay once again from RMYoung wind sensor.
- Time:2007-01-15 12:00:00, Status: 0
- Comments: Valid wind speed and gust readings from RMYoung being received again.
- Time:2006-12-31 22:00:00, Status: 1
- Comments: Gusts too high, flagged winds as invalid. Sonic anemometer working okay.
- Time:2007-02-10 12:00:00, Status: 0
- Comments: Winds appear okay once again from RMYoung wind sensor.
- Time:2007-01-15 12:00:00, Status: 0
- Comments: Valid wind speed and gust readings from RMYoung being received again.
Deployed on Mooring: E0118
- Mooring Details: from 2006-09-12 13:20:00 to 2006-12-05 17:10:00
- Time Event: 2006-09-12 13:20:00, Redeployed by R/V Argo Maine.
Time Event: 2006-12-05 17:10:00, Recovered by R/V Argo Maine
- Data_type: wind_speed and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: A0115
- Mooring Details: from 2005-10-22 11:40:00 to 2006-04-09 11:25:00
- Time Event: 2005-10-22 11:40:00, redeployed by R/V Argo Maine
Time Event: 2006-04-09 12:25:00, recovered by NOAA Ship Delaware II
- Data_type: wind_gust and Depth: -4 m
- Time:2006-02-04 15:45:00, Status: 0
- Comments: Replaced wind sensor from F/V Tully IV.
- Time:2006-02-04 15:45:00, Status: 0
- Comments: Replaced wind sensor from F/V Tully IV.
- Time:2006-02-04 15:45:00, Status: 0
- Comments: Replaced wind sensor from F/V Tully IV.
Deployed on Mooring: B0109
- Mooring Details: from 2005-04-29 03:30:00 to 2005-10-22 16:15:00
- Time Event: 2005-04-29 03:30:00, Redeployed by RV Delaware II
Time Event: 2005-07-31 12:00:00, Cellphone transmissions becoming intermittent.
Time Event: 2005-08-04 21:00:00, Last cellphone transmission was received. Cellular company reports that the buoy's cellphone is roaming and are looking into the problem.
Time Event: 2005-10-22 16:15:00, Recovered by R/V Argo Maine.
- Data_type: wind_speed and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: A0112
- Mooring Details: from 2004-11-10 18:35:00 to 2005-01-05 12:05:00
- Time Event: 2004-11-10 18:35:00, Mooring redeployed by F/V Donna Marie (new control box).
Time Event: 2005-01-05 12:05:00, Recovered by R/V Argo Maine, all instruments/equipments intact.
- Data_type: wind_gust and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: A0111
- Mooring Details: from 2004-10-08 04:40:00 to 2004-11-10 16:40:00
- Time Event: 2004-10-08 04:40:00, Mooring redeployed by R/V Argo Maine.
Time Event: 2004-10-24 09:00:00, Last data received from buoy (both cellphone and Goes stopped).
Time Event: 2004-10-29 15:50:00, Repair of control box started.
Time Event: 2004-11-03 17:00:00, Last data received from buoy on either cellphone or Goes.
Time Event: 2004-11-10 16:40:00, Mooring recovered by F/V Donna Marie..
- Data_type: wind_speed and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: F0107
- Mooring Details: from 2003-09-25 22:47:00 to 2004-04-27 12:30:00
- Time Event: 2003-09-25 22:47:00, Redeployed by R/V Argo Maine
Time Event: 2004-01-01 01:00:00, Goes transmitter failed (leap year problem with Seimac tranmsitter)
Time Event: 2004-04-27 12:30:00, Recovered by R/V Argo Maine.
- Data_type: wind_gust and Depth: -4 m
Data_type: wind_direction and Depth: -4 m
Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: F0105
- Mooring Details: from 2003-01-31 18:45:00 to 2003-07-09 19:50:00
- Time Event: 2003-01-31 18:45:00, Deployed by R/V Argo Maine
Time Event: 2003-02-14 00:00:00, Cell phone becoming intermittent in periods of cold/windy weather
Time Event: 2003-02-28 16:30:00, Cell phone antenna replaced, cell phone calls still intermittent in periods of cold/windy weather
Time Event: 2003-07-09 19:50:00, Recovered by R/V Argo Maine.
- Data_type: wind_gust and Depth: -4 m
- Time:2003-03-19 19:00:00, Status: 0
- Comments: New wind sensor installed on buoy, wind speed and direction appear valid.
- Time:2003-03-19 19:00:00, Status: 0
- Comments: New wind sensor installed on buoy, wind speed and direction appear valid.
- Time:2003-03-19 19:00:00, Status: 0
- Comments: New wind sensor installed on buoy, wind speed and direction appear valid.
Non-Deployment Sensor Events:
- Time Event: 2014-05-23 00:00:00, Event: Pre-Deployment
- Comments: Prepped for Buoy F
- Time Event: 2012-03-27 00:00:00, Event: Pre-Deployment
- Comments: Passed Checkout - Ready to Deploy on Buoy F
- Time Event: 2012-03-27 00:00:00, Event: Post-Recvry: PASS
- Comments: Passed Checkout - Ready to Deploy on Buoy F
- Time Event: 2007-08-29 00:00:00, Event: Retired
- Comments: Retired, rebuilt for use as test instrument using worn parts, DO NOT DEPLOY
- Time Event: 2007-06-12 00:00:00, Event: None
- Comments: Recovered - awaiting check-in
- Time Event: 2006-08-30 00:00:00, Event: Pre-Deployment
- Comments: ready to deploy
- Time Event: 2006-01-19 00:00:00, Event: Pre-Deployment
- Comments: PASS - READY TO DEPLOY
- Time Event: 2006-01-18 00:00:00, Event: Post-Recvry: PASS
- Comments: FAIL - BAD SPEED SUBSYSTEM
- Time Event: 2006-01-18 00:00:00, Event: Post-Recvry: PASS
- Comments: FAIL - BAD SPEED SUBSYSTEM
- Time Event: 2005-03-24 00:00:00, Event: Pre-Deployment
- Comments: Ready to deploy
- Time Event: 2005-01-27 00:00:00, Event: Post-Recvry: FAIL
- Comments: Vane torque test failed.
- Time Event: 2004-08-12 00:00:00, Event: Pre-Deployment
- Comments: READY TO DEPLOY
- Time Event: 2004-05-11 00:00:00, Event: Refurbished
- Comments: New Bearings, DC44, Ready For Checkout
- Time Event: 2004-05-07 00:00:00, Event: Post-Recvry: FAIL
- Comments: FAIL: Front Prop Bearing Destroyed, Vane Bearings Torque Too High
- Time Event: 2003-09-16 00:00:00, Event: Pre-Deployment
- Comments:
- Time Event: 2003-09-15 00:00:00, Event: Refurbished
- Comments: New Prop + Vane Brgs, DC44 on ALL brgs + pot, Cables sealed with DC111
- Time Event: 2003-07-14 00:00:00, Event: Post-Recovery
- Comments: Slight corrosion on propeller bearings vane not checked REPLACE BOTH BEARING SETS