GoMoos Sensor History for Sensor: SBESM7049
- Manufacturer: Sea-Bird_Electronics_Inc,
Model: SBE37SM
Purchase Date: 2015-07-01
Deployed on Mooring: I0139
- Mooring Details: from 2022-10-17 16:05:00 to 2024-05-06 16:06:00
- Time Event: 2022-10-17 16:05:00, Deployed by M/V Warren
Time Event: 2024-05-06 16:06:00, Recovered by R/V Connecticut
- Data_type: conductivity and Depth: 1 m
Data_type: temperature and Depth: 1 m
Deployed on Mooring: B0134
- Mooring Details: from 2020-09-15 02:21:00 to 2021-06-16 10:45:00
- Time Event: 2020-09-15 02:21:00, deployed by the R/V Connecticut
Time Event: 2020-09-15 18:35:00, recovered by the R/V Connecticut
Time Event: 2021-06-16 11:00:00, recovered by R/V Connecticut prior to instrument swap
- Data_type: conductivity and Depth: 1 m
- Time:2020-11-21 06:03:00, Status: 1
- Comments: last data from ctd. Low voltage. vMain = 6.86, vLith = 2.89, "not logging, low battery"
- Time:2020-11-21 06:03:00, Status: 1
- Comments: last data from ctd. Low voltage. vMain = 6.86, vLith = 2.89, "not logging, low battery"
Deployed on Mooring: E0503
- Mooring Details: from 2019-07-24 15:25:00 to 2019-12-17 15:50:00
- Time Event: 2019-07-24 15:25:00, deployed by the R/V Ira C.
Time Event: 2019-12-17 15:50:00, Recovered by R/V IRA C. 5M IM apparently slid down to 10m at some point during deployment.
- Data_type: conductivity and Depth: 2 m
Data_type: temperature and Depth: 2 m
Deployed on Mooring: J0401
- Mooring Details: from 2018-07-20 14:40:00 to 2019-05-04 14:25:00
- Time Event: 2018-07-20 14:40:00, SeaNet buoy deployed in Machias Bay
Time Event: 2019-05-04 14:25:00, Recovered by Cooke Aquaculture in Eastport.
- Data_type: conductivity and Depth: 2 m
Data_type: temperature and Depth: 2 m
Deployed on Mooring: C0502
- Mooring Details: from 2016-04-14 11:50:00 to 2016-12-06 14:10:00
- Time Event: 2016-04-14 11:50:00, Deployed by the F/V Ellen Marie
Time Event: 2016-12-06 14:10:00, recovered by F/V Ellen Marie
- Data_type: conductivity and Depth: 2 m
Data_type: temperature and Depth: 2 m
Deployed on Mooring: C0501
- Mooring Details: from 2015-10-15 15:20:00 to 2015-12-04 18:30:00
- Time Event: 2015-10-15 15:20:00, Deployed out of Camp Ellis, by fishing vessel
Time Event: 2015-12-04 18:30:00, Recovered by F/V Ellen Marie (anchor hung up on bottom; recovery attempt later this month)
- Data_type: conductivity and Depth: 2 m
Data_type: temperature and Depth: 2 m
Deployed on Mooring: C0304
- Mooring Details: from 2010-03-07 14:45:00 to 2010-11-03 13:45:00
- Time Event: 2010-03-07 14:45:00, Redeployed by R/V Gulf Challenger.
Time Event: 2010-11-03 13:45:00, Recovered by R/V Gulf Challenger.
- Data_type: conductivity and Depth: 1 m
Data_type: temperature and Depth: 1 m
Non-Deployment Sensor Events:
- Time Event: 2022-09-22 22:45:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
- Comments: Replaced the O-rings. Performed a hydrostatic pressure test. Installed NEW AF24173 Anti-foulant cylinder(s).
- Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
- Comments: Performed initial diagnostic evaluation. Performed "POST" cruise calibration. Cleaned and replatinized conductivity cell. Performed "FINAL" calibration.
- Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
- Comments: Problems Found: Conductivity cell found to have high drift.
- Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
- Comments: Services Requested: SERVICE37 REPLACEAF
- Time Event: 2022-01-19 12:00:00, Event: Out_for_Repair
- Comments:
- Time Event: 2020-02-12 00:00:00, Event: Out_for_Repair
- Comments:
- Time Event: 2020-02-04 00:00:00, Event: Post-Recovery
- Comments: Data file downloaded
- Time Event: 2020-01-28 00:00:00, Event: Post-Recovery
- Comments: Data file downloaded
- Time Event: 2019-06-26 18:49:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2018-06-04 19:24:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2018-02-12 00:00:00, Event: Post-Recovery
- Comments: Data file downloaded
- Time Event: 2016-12-13 00:00:00, Event: Post-Recovery
- Comments: Data file downloaded
- Time Event: 2016-04-06 12:00:00, Event: Prepared
- Comments: Ready for deployment
- Time Event: 2015-12-09 00:00:00, Event: Post-Recovery
- Comments: Data file downloaded