GoMoos Sensor History for Sensor: SETPR2299992
- Manufacturer: Setra,
Model: 270
Purchase Date: 2004-06-11
Deployed on Mooring: F0137
- Mooring Details: from 2026-05-01 22:51:00 to 0000-00-00 00:00:00
- Time Event: 2026-05-01 22:51:00, Deployed by R/V Connecticut
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: M0125
- Mooring Details: from 2015-11-05 04:05:00 to 2016-10-08 11:50:00
- Time Event: 2015-11-05 23:05:00, Redeployed (turnaround) by the R/V Connecticut
Time Event: 2016-10-08 11:50:00, Recovered by R/V PISCES
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: M0124
- Mooring Details: from 2014-09-18 18:04:00 to 2015-11-04 14:15:00
- Time Event: 2014-09-18 18:04:00, Redeployed by R/V Connecticut.
Time Event: 2015-11-04 14:15:00, Recovered (for turnaround) by R/V Connecticut
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: M0122
- Mooring Details: from 2013-06-23 16:34:00 to 2014-05-31 11:00:00
- Time Event: 2013-06-23 16:34:00, Redeployed by R/V Connecticut.
Time Event: 2014-03-21 12:25:00, Last backup Goes transmission received from buoy. Since the primary Iridium system failed in Jan 2014, no data are presently being received from this site.
Time Event: 2014-05-06 16:15:00, Vist to buoy M01 by R/V Osprey. Considerable water found in well; battery failed. Removed control box; installed trackpack. Air, visibility and RMYoung had been damaged.
Time Event: 2014-05-31 11:30:00, Recovered by R/V Connecticut.
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: M0121
- Mooring Details: from 2012-10-25 14:05:00 to 2013-03-30 19:35:00
- Time Event: 2012-10-25 14:05:00, Redeployed by R/V Connecticut
Time Event: 2013-02-09 16:30:00, Buoy is no longer anchored and has drifted off station. Instruments are still reporting but data may not be from the anchor location.
Time Event: 2013-03-30 19:35:00, Recovered by M/V Scarlett Isabella (buoy and top part of the mooring which broke free in early February 2013).
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0127
- Mooring Details: from 2011-10-08 14:50:00 to 2012-04-16 12:38:00
- Time Event: 2011-10-08 14:50:00, Redeployed by R/V Connecticut
Time Event: 2012-04-16 12:38:00, Recovered by R/V Delaware II.
- Data_type: barometric_pressure and Depth: -3 m
- Time:2012-01-22 01:00:00, Status: 1
- Comments: Barometric pressure sensor failed (reads too low).
- Time:2012-02-05 13:30:00, Status: 0
- Comments: Replaced barometric pressure sensor.
Deployed on Mooring: A0125
- Mooring Details: from 2010-10-13 22:42:00 to 2011-06-01 14:45:00
- Time Event: 2010-10-13 22:42:00, Redeployed by R/V Connecticut
Time Event: 2011-06-01 14:45:00, Recovered by R/V Connecticut. The cable between the inductive coupler and the serial bridge/optode was found damaged; otherwise all instruments recovered intact.
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0123
- Mooring Details: from 2009-09-23 16:55:00 to 2010-06-03 14:09:00
- Time Event: 2009-09-23 16:25:00, redeployed by R/V Argo Maine
Time Event: 2010-06-03 14:09:00, recovered by RV Argo Maine
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0121
- Mooring Details: from 2008-10-01 14:35:00 to 2009-03-20 19:28:00
- Time Event: 2008-10-01 14:35:00, Redeployed by R/V Argo Maine.
Time Event: 2009-03-20 19:28:00, Recovered by R/V Delaware II.
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0119
- Mooring Details: from 2007-09-23 14:40:00 to 2008-04-15 21:54:00
- Time Event: 2007-09-23 14:40:00, Redeployed by R/V Argo Maine.
Time Event: 2008-04-15 23:59:59, Mooring A0119 Recovered By FV Delaware II, RMY Missing, Gill Damaged, Tower Bent, SBE16 & SBE44-optode smashed together
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0117
- Mooring Details: from 2006-09-13 21:35:00 to 2007-03-23 11:25:00
- Time Event: 2006-09-13 21:35:00, Redeployed by R/V Argo Maine.
Time Event: 2007-03-23 11:25:00, Mooring A0117 Recovered By RV Delaware II
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0115
- Mooring Details: from 2005-10-22 11:40:00 to 2006-04-09 11:25:00
- Time Event: 2005-10-22 11:40:00, redeployed by R/V Argo Maine
Time Event: 2006-04-09 12:25:00, recovered by NOAA Ship Delaware II
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0113
- Mooring Details: from 2005-01-05 20:30:00 to 2005-04-29 12:30:00
- Time Event: 2005-01-05 20:30:00, Mooring redeployed by R/V Argo Maine
Time Event: 2005-04-29 12:30:00, Recovered by RV Delaware II
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0112
- Mooring Details: from 2004-11-10 18:35:00 to 2005-01-05 12:05:00
- Time Event: 2004-11-10 18:35:00, Mooring redeployed by F/V Donna Marie (new control box).
Time Event: 2005-01-05 12:05:00, Recovered by R/V Argo Maine, all instruments/equipments intact.
- Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: A0111
- Mooring Details: from 2004-10-08 04:40:00 to 2004-11-10 16:40:00
- Time Event: 2004-10-08 04:40:00, Mooring redeployed by R/V Argo Maine.
Time Event: 2004-10-24 09:00:00, Last data received from buoy (both cellphone and Goes stopped).
Time Event: 2004-10-29 15:50:00, Repair of control box started.
Time Event: 2004-11-03 17:00:00, Last data received from buoy on either cellphone or Goes.
Time Event: 2004-11-10 16:40:00, Mooring recovered by F/V Donna Marie..
- Data_type: barometric_pressure and Depth: -3 m