GoMoos Sensor History for Sensor: SUMAC1650A00161
- Manufacturer: Summit,
Model: 34203A
Purchase Date: 2011-01-10
Deployed on Mooring: F0137
- Mooring Details: from 2026-05-01 22:51:00 to 0000-00-00 00:00:00
- Time Event: 2026-05-01 22:51:00, Deployed by R/V Connecticut
- Data_type: significant_wave_height and Depth: 0 m
Data_type: dominant_wave_period and Depth: 0 m
Deployed on Mooring: F0135
- Mooring Details: from 2022-10-18 20:53:00 to 2024-05-04 21:32:00
- Time Event: 2022-10-18 20:53:00, Deployed by M/V Warren
Time Event: 2022-12-10 00:00:00, battery appears to be failing, likely to be offline soon.
Time Event: 2022-12-18 12:00:00, battery failure
Time Event: 2023-02-09 19:30:00, battery replaced, solar panel replaced, bulkhead cables repositioned, buoy back online.
Time Event: 2024-05-04 21:32:00, Recovered by R/V Connecticut
- Data_type: significant_wave_height and Depth: 0 m
Data_type: dominant_wave_period and Depth: 0 m
Deployed on Mooring: F0132
- Mooring Details: from 2019-06-04 18:18:00 to 2020-11-10 12:50:00
- Time Event: 2019-06-04 18:18:00, deployed by the R/V Connecticut
Time Event: 2020-11-10 12:50:00, Recovered by R/V Connecticut
Time Event: 2019-06-10 21:00:00, battery voltage high (>16.5V during deployment). Probably solar panel plugged directly into battery port
- Data_type: significant_wave_height and Depth: 0 m
Data_type: dominant_wave_period and Depth: 0 m